The second firing of the Vulcan Works Wobbler

Callum with kiln

Firing two. It took much longer than planned to get to this point, some work on the kiln was very much required and it meant the whole thing had to come down and be rebuilt. Why? Mostly, I wanted a layer of insulating bricks under the floor (which budget did not stretch to 6 months… Continue reading The second firing of the Vulcan Works Wobbler